No |
Project |
Location |
Client |
|
1 |
Heating, plumbing, fire protection |
Soma-B Thermal Power Plant |
GAMA |
|
2 |
Bottom outlet tunnel ventilation system |
Golova II Dam |
ERDANIS |
|
3 |
Domestic natural gas heating system installations |
Ankara |
EGO |
|
4 |
Roof heating pipe installation |
Middle East Technical University |
EBI |
|
5 |
Bottom outlet tunnel ventilation system |
Hacihidir Dam |
ONAR-GUNSAYIL |
|
6 |
Powerhouse air-conditioning, ventilation, lightening, grounding, communication, clean and waste water, fire water, low pressure air supply, drainages |
Beykoy Dam and Hydroelectric Power Plant |
AYDINER |
|
7 |
90/70 °C hot water heating, hot air heating, ventilation and heat exchanger rooms of various shops |
Elmadag |
MKE- BARUTSAN |
|
8 |
Concrete prefabrication plant-heating, plumbing, fire protection, yard lightening and light protection systems for various sections |
Nuh Cimento-İkitelli İstanbul |
GAMA |
|
9 |
Concrete prefabrication plant-heating,plumbing,fire protection,yard lightening and light protection systems for various sections |
Nuh Cimento-İzmit |
GAMA |
|
10 |
Water treatment plant - 90/70° C hot water heating, ventilation, air-conditioning systems for various departments |
Manavgat / Antalya |
EMT - AYDINER |
|
11 |
Ankara Metro Project Phase 1 -Consultancy, review and inspection work on heating, ventilating, air-conditioning, plumbing, drainage and fire fighting systems design and erection |
Ankara |
EGO |
|
12 |
Powerhouse and technical rooms heating, ventilating and air- conditioning |
Berke Dam and Hydroelectric Power Plant |
YAPI ve TICARET |
|
13 |
Heating, ventilating and air-conditioning, industrial and domestic water, low pressure air, lightening, grounding, energy transmission, public address, telephone, clock systems for power house, switchyard and dam area |
Ermenek Dam and Hydroelectric Power Plant |
BM |
|
14 |
Ankara Metro Project – Phase 3 -Consultancy, design review, inspection, testing and commissioning work on heating, ventilating, air-conditioning(HVAC), including emergency ventilation of tunnels and stations, plumbing, drainage and fire fighting (water and gas) systems for 19 km line and 14 stations. |
Ankara |
EGO-Municipality Of The Greater City Of Ankara |
|
15 |
Ankara Metro Project –Umitkoy Cayyolu Line- Preparation of basic and final design, technical specification and tender documents for 2 stations , heating, ventilating, air-conditioning (HVAC), including emergency ventilation, plumbing, drainage and fire fighting (water and gas) systems for 4 km line |
Ankara |
EGO- Municipality Of Greater City Of Ankara |
|
16 |
Izmir Metro Project - Preparation of basic design, technical specification and tender documents for 11 stations , heating, ventilating, air-conditioning (HVAC), plumbing, drainage and fire fighting (water and gas) systems for 60 km line |
Izmir |
ESHOT- Municipality of Greater City of Izmir |
|
17 |
Izmir Railway Project - Preparation of application design, technical specification and tender documents for 2 stations , heating, ventilating, air-conditioning (HVAC), plumbing, drainage and fire fighting (water and gas) systems |
TCDD 3. Bolge Mudurlugu - Izmir |
Mustafa Ozcan |
| 18 |
4 x 360 MW Boiler Houses heating system by steam |
4 x 360 MW Boiler Houses heating system by steam |
GTT |
| 19 |
Heating system by using waste steam obtained from the thermic power plant for heating industrial and social facilities in Çayırhan. |
Ankara |
CİNER |
| 20 |
HVAC, lighting, grounding, drainage and weak current systems for powercavern and transformer room. |
ERİK H.E.P.P |
ALPİNA GMBA |
|
|
|
|
|