No |
Project |
Location |
Client |
|
1 |
Coal preparation systems – Stackers and reclaimers, belt conveyors and related steel structures |
Catalagzı Thermal Power Plant
2 x 150 MW |
GURIS |
|
2 |
Coal preparation systems – Stackers and reclaimers, belt conveyors and related steel structures |
Cayırhan Thermal Power Plant
2 x 157 MW |
GURIS |
|
3 |
Heating, plumbing, fire fighting systems |
Soma-B Thermal Power Plant 6 x 165 MW |
GAMA |
|
4 |
Steel structures |
Hakkari Mobile Thermal Power Plant 24 MW |
AKSA |
|
5 |
Flu gas desulfurisation system – Improving existing screw feeder |
Kemerkoy Thermal Power Plant 3 x 210 MW |
GAMA |
|
6 |
-Steel structures for steam pipes |
Ankara Natural Combined Cycle Power Plant 770 MW |
NOSKE-KAESER GmbH |
| 7 |
Boiler houses heating system (by steam) |
EUAS Afsin – Elbistan B Thermal Power Plant 4 x 360 MW |
GTT |
| 8 |
Heating system by using waste steam obtained from the thermic power plant for heating industrial and social facilities in Çayırhan. |
ANKARA |
CINER |
| 9 |
Coal conveying system with 3600 m length from coal mine to the thermıc power plant. |
ANKARA |
CINER |
|
|
|
|
|